According to Tomase
None of them has installed it midseason. The primary barrier to a quick installation would be weather. The Gillette grass needs to be torn up and the field graded before the turf can be laid down. The process can take two months or two weeks, depending on manpower, event schedules and other factors.
So a minimum of 2 weeks is required to install (if you are lucky) and 3-4 would be safer to ensure it is done before the fans come into the stadium expecting to see football.
I don't see a 3 week time in schedule free until the break between week 15 and the Div Champs weekend and that only works if we earn a bye.
Ongoing - film crew ? til ?
10/28/2006 NE Revolution vs. Chicago Fire - Eastern Conference Semis
??? other soccer playoff games ????
Sun 11/5/2006 8:15 PM vs Colts (wk 9)
Sun 11/12/2006 1:00 PM vs Jets (wk 10)
Sun 11/26/2006 1:00 PM vs Bears (wk 12)
Sun 12/3/2006 1:00 PM vs Lions (wk 13)
Sun 12/17/2006 1:00 PM vs Texans (wk 15)
Sat/Sun 6-7/1/2007 WC Wkend
Sat/Sun 13-14/1/2007 Div Wkend
I'm very sceptical field turf can be laid this season.